Bot is serving as the general contractor for the rehabilitation of existing bin wall structures at McKellar Creek and Ripple Creek along Highway 17, between Terrace Bay and Marathon in Northern Ontario. The project includes targeted structural coating and re-facing to mitigate age-related deterioration and withstand harsh climatic conditions.
In addition, concrete repairs to the headwalls at both locations are being completed. Construction will be carried out in staged phases to maintain uninterrupted traffic flow along this vital transportation corridor, with overall project completion anticipated in November 2026.
Key Elements:
New Bin Wall structures
Sandblasting and coating of the existing Bin Wall surfaces
Concrete repairs to the existing culvert headwalls